Misenge Environmental and Technical Services Limited (METS) earned a total of K6.22 million as revenue for the year ended 31st March 2016 (2015: K6.23 million). METS recorded a loss after tax of K2.9 million (2015: K0.6 million).
METS was awarded a contract as a project management consultant firm during the nine month preparatory stage of the Zambian Mining Environmental Remediation and Improvement Project (ZMERIP). ZMERIP is a World Bank led project whose “objective is to reduce environmental health risks to the local population associated with the mining sector in critically polluted areas in Kabwe and Copperbelt provinces through improved capacity of the key institutions”. This is expected to improve METS’s income base going forward.
There were no dividends declared during the year under review (2015: nil).